Sunday, September 13, 2015

House Update (Sept. 13, 2015)

House update:  Sept. 13, 2015 


Expected finish date:  Oct. 8, 2015
























Below:  Hallway upstairs

Below:  Laundry Room upstairs (to the right as you go up the stairs to 2nd floor)




Below: Doorway to Master Bedroom

Below: Master Bedroom (to the left as you go up the stairs to 2nd floor)


Below: Bathroom adjacent to master bedroom

Below: Master Bathroom















Below: view into the first guest room from hallway on 2nd floor (guest room nearest to the master bedroom)

Below: open closet inside the first guest room

Below: view out the window from the guest room (looking at the neighbor's house on the left of our house as you look out toward the street)

Below: inside the first guest room and looking toward the door that connects to the hallway


Below: in hallway, going toward the bonus room

Below: ceiling door above the bonus room

Below: inside the bonus room



Below: inside the bonus room, looking to the left toward the door that connects to the 2nd guest bedroom, furthest from the master bedroom

Below: looking into the 2nd guest bedroom from the hallway


Below: inside the 2nd guest bedroom, with window view of the front yard and toward the street


Below: closet for the 2nd guest bedroom



Below: inside the closet for the 2nd guest bedroom





Below: inside the 2nd guest bedroom, looking through the door that leads to the hallway that passes the adjacent bonus room and toward the 1st guest bedroom

Below: view from inside the outside and through the front door window, looking at the front yard and street

Below: view through the top windows of the front door


Below: coat closet and 1/2 bathroom near bottom of stairs on first floor, near the front door

Below: coat closet downstairs





Below: 1/2 bathroom downstairs








Below: view of the 1st floor as you walk through the front door


Below: closet located below the stairway



Below: fireplace in corner of 1st floor living room




Below: windows in front of the back patio (cement slab) and breakfast nook


Below: kitchen


Below: looking back from the living room into the front hall entrance



Below: our backyard and neighbors' yards to the left


















Below: office/technology area






Below: where the refrigerator will go (?)



Below: evidence that our workers like to enjoy a smooth beverage while on the job (no complaints here, as long as they finish a quality job before Oct. 8th!!!)

Below: entrance to the garage

Below: door to the garage

Below: a 2nd coat closet near the entrance to the garage?











Below: entrance to the garage

Below: inside the closed garage










Below: door to the back patio (cement slab) next to the breakfast nook (area by the window)

Below: back door entrance to the patio


Below: view of our neighbors's houses to the right of us as we look out toward the backyard




Below: view of our neighbors's houses to the left of us as we look out toward the backyard



Below: the steps and cover of our front door


Below: view of the street to the left and you stand in our driveway


Below: view in front of our house as you stand in the driveway

Below: view of the street to the right and you stand in our driveway

Below: view of the street to the right and you stand in our driveway

Below: view of the street to the right and you stand in our driveway




No comments:

Post a Comment